|
Product Downloads
Info Sheet & Install Guide
Armor-Edge n2e Joint Assembly
Master Specification
Armor-Edge n2e Joint
Assembly Master Specification
AutoCad Drawings
Armor-Edge n2e Assembly Installation
AutoCad PDFs
Armor-Edge n2e Assembly Installation
Material Saftey Data Sheets (MSDS)
Armor-Edge n2e Joint Assembly MSDS

Download Adobe Acrobat Reader
|
Smooth Transitions Between Slabs Just Got Easier
Armor-Edge® n2e joint assembly
is a superior edge protection system for transitions from new to existing concrete
slabs. Typically it is used in expansions and repairs of freezer buildings, new
door openings and other high-traffic areas to provide a smooth transition for forklift
traffic.
Design Advantages
- Eliminates spalling for the life of the floor
- Improves surface tolerances and profile of the existing slab
- Arrives at the jobsite fully aligned and assembled for simple, efficient and accurate
installation
- PNA Square Dowel Clips have foam sides to allow lateral movement and accommodate
slab shrinkage without causing restraint
Installation Advantages
- Eliminates form removal
- Ships as a complete engineered system with seven 3/4" x 12" square dowels, seven 3/4" x 7" square dowel clips and five anchor bolts
- Cold-rolled steel provides a flat exposed surface edge to finish against
|
|
|
|
©2008 PNA Construction Technologies, Inc. All Rights Reserved.
Diamond Dowel®, PD3 Basket®, Load Plate Basket®
and Armor-Edge® are registered trademarks and HydraCure and
Square Dowel Clip are trademarks of PNA Construction Technologies, Inc. Products
shown may be covered by one or more of U.S.patents #6,775,952, #6,354,760, #5618125;
Great Britain patent #1034340; Mexico patent #22942;New Zealand patent #504785;
India patent #203607 and other pending patents. |